Monday 23 November 2026 Madrid

Search

Madrid and Spain news in English, from the capital outward.

Madrid-Sevilla AVE Cut Has Cost Seville 30 Million Euros, Mayors Say

The mayors of Seville and Madrid say the high-speed rail cut has cost Seville 30 million euros. What they claim, the Dec. 13 date and the election context.

Modern empty trains standing near platform with yellow lines on railway station
Photo: Josh Sorenson / Pexels

Seville has lost more than 30 million euros since high-speed trains between Madrid and the south stopped running after the Toledo accident, the city’s mayor, José Luis Sanz, said this week outside Sevilla-Santa Justa station. Madrid mayor José Luis Martínez-Almeida stood beside him and said he had flown to Seville because the trip by train was impossible.

Sanz warned that the losses would pass 70 million euros if the AVE (Spain’s high-speed train) is not back by Dec. 13, and 120 million euros if service does not return until after Christmas. The figures are the mayors’ own estimates, as reported by El Correo de Andalucía.

A campaign stop at an empty station

The two mayors called the event as part of the campaign for the Nov. 29 general election. Sanz questioned what kind of service would resume on Dec. 13 and under what safety conditions, and asked Prime Minister Pedro Sánchez to answer.

He said the PP (Partido Popular) proposes an aid plan for the Seville businesses hit by the cut, plus an emergency investment and maintenance plan for the line, above all to modernize the LZB system, the train control and signaling technology used on the route. Sanz argued the infrastructure needs a full renewal to win back the Madrid and Seville residents who used the line every day.

Almeida said the 30 million euros lost so far was only the start of what Seville would keep losing without high-speed trains to Madrid. Referring to Tuesday’s rail sector strike, he called Santa Justa “a ghost station” and blamed the Sánchez government.

Attacks on Adif and the government

Almeida also criticized new appointments at Adif (the state company that manages Spain’s rail infrastructure). The government has said the new managers will be qualified technical staff, and Almeida argued that this amounted to admitting earlier posts had gone to political allies. He claimed Spain now has the least safe rail network in the world with the highest accident rate but gave no figures to support it. He also accused the government of corruption over renovation work on the Puente del Centenario in Seville.

All of these are campaign statements made less than two weeks before the vote.

What it means for travelers between Madrid and Seville

For people in Madrid, the cut means there is still no high-speed rail link to Seville and the rest of the southern corridor, which is why Almeida made the trip by plane. The date both mayors referred to for the return of the AVE is Dec. 13, and Sanz’s highest estimate assumes the return could slip past Christmas. The Ministerio de Transportes (Spain’s transport ministry) decides when service resumes.

Travelers planning trips to Andalusia in December should watch for official updates from the transport ministry and Adif before booking. The general election is on Nov. 29.

Source: El Correo de Andalucía